detail pto ZF
| Code | Capacity | L/min rpm 1000 | Working Pressure (Bar) | Max. Pressure (Bar) | Inlet/Outlet |
|---|
| 120H27HSAS | 27 | 27.0 | 350 | 600 | R1´´1/2-R3/4´´ |
| 120H30HSAS | 30 | 30.0 | 350 | 600 | R1´´1/2-R3/4´´ |
| 120H41HSAS | 41 | 41.0 | 350 | 600 | R1´´1/2-R3/4´´ |
| 120H55HSAS | 55 | 55.0 | 350 | 600 | R1´´1/2-R3/4´´ |
| 120H60HSAS | 60 | 60.0 | 350 | 600 | R1´´1/2-R3/4´´ |
PISTON PUMPS
Piston Pump 6P ASAE Dark Short High Pressure
PISTON PUMPS
-
Joysticks for PTO
-
Switches for PTO
-
Cable Controls for PTO
-
Washers for PTO
-
Studs and Nuts for PTO
Direction is Bi-Directional
Nitration body
Nodular cast iron 3G-40 body and cover
Forged steel 8620 of Crank and annealing 58-60 HRC with 1,5mm depth
Used 2 bearing; one of is 31308 Timken Bearing and other one is special designed in 3 stage
Used bushing as Federalmogul and GGB brands
Used 2 felts and one of them is viton
The length of connection shaft can be set as 105 mm
To order pump with 105 mm shaft change the last letter of the code to 'L' (f.e 120H60HSAL)